This post contains posts from the week ending 3.15.15.  MEP Rough continues and lighting location adjustments can be seen transposed on the floor for revisions to installed in the ceiling.  Ice and water shield on the roof substantially complete.  The large piles of material on the roofing is the taper system which layout has commenced with installation to follow.  Plumbing in wall rough can be seen and is ongoing as well.