This post contains pictures from the week of March 29, 2015.  Roofing ongoing and most of the taper system has been installed with the topsheet being applied and terminated to parapets and drain locations.  MEP rough continues with lighting locations being installed and ongoing.  Homeruns for lighting are being pulled to the respective sub-panels.  HVAC split system unit(s) are on site and rough installation is ongoing.