This post contains pictures for the week ending July 20, 2014.  This photoset is an addition to the post that also has pictures for this week.   This post also focuses on concrete process of the project.  The concrete stem wall forms have been built and are now being verified and double checked.  Final adjustments are being made to the baseplates that hold up the steel and wooden columns (shown covered in foil for protection).  The concrete pour is beginning with a mixer and pump truck with a large boom (for reach).  The stemwalls are then depicted complete and the formboards are being stripped and cleaned to reuse.