This post contains pictures for the week ending September 5, 2014.  We have officially moved into the framing phase this week with the underfloor framing of the East Wing.  This part of the foundation is built on stemwalls and will have a crawlspace allowing for the HVAC ducting to be run beneath.  The anchor bolts poured into the concrete are now used to hold down the sill plates, upon  which the floors and walls will be built.  Also depicted are the forms that will hold the landscaping concrete.  This concrete will contain the terrace pavers.