This post contains pictures for the week ending July, 20 2014.  This photoset depicts the concrete stemwalls in place with utility stubs visible.  Also visible are the anchor bolts that the sill plate and framing will be bolted to.  The black paper attached to the stemwalls  is the foundation waterproofing.  The metal plates that are on top of the stemwall are templates marking the location of the steel columns.  Progress is moving forward according to schedule.