This post contains pictures for the week ending August 11th, 2013.  Currently, underslab sewer lines are being installed as well as the sewer tank and pump.  The temporary electrical meter is being installed and back filled.  There are also pictures of the large boulder that was recently relocated via the crane.

[flickrset id=”72157635047450714″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]