This post contains pictures for the week ending April 20th, 2014.  Pick up framing is ongoing.  Rough Electrical wiring is ongoing.  Electrical panels are being wired as well.  Rough plumbing and HVAC is ongoing as well.  There are pictures of the mock up as well.

[flickrset id=”72157644211523461″ thumbnail=”small” photos=”” overlay=”true” size=”large”]