This post contains pictures for the week ending September 15, 2013.  The lower pad stem walls are being poured in place.  The concrete is placed via a concrete boom pump truck that pumps the concrete from the trucks into the formed walls.  We had a third party inspector observe the entire pour as well as take concrete samples for quality control testing in their lab.