This post contains pictures for the week ending November 24th, 2013.  The floor joists for the office and above the crawl space area have been installed as well as the office subfloor.  The garage and office mud sill bottom plates have been installed and prepped for wall framing.

[flickrset id=”72157637954082866″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]