This post contains pictures for the week ending September 29th, 2013.  the grade cut of the upper pad has been completed under observation if the 3rd party special inspector.  The Rockery wall has been completed as well, there are pictures from both inside and outside of the building.  The lower pad sub slab utilities are being performed.