This post contains photos of the week ending August 25th, 2013. Steel and forms are being finalized to set up pour of the Pavilion, Garage/Mud Entry, and Terraces. The main portion of the house is being framed, and the pedestals are formed for the east (master) wing.

[flickrset id=”72157635205438868″ thumbnail=”small” photos=”” overlay=”true” size=”medium”]