This post contains pictures for the week ending July 13, 2014.  The driveway is compacted and ready for asphalt.  The anchor bolts are protruding from the concrete stemwalls waiting to receive steel and wood members. Down below in the Media Room and Bunk Room Areas the yellow subslab insulation can be seen with the hydronic tubing placed above it.  The tubing manifolds (for radiant heating) can be seen and are where zone adjustments can be made, and are where all the tubes meet to return back to the boiler.