This post contains pictures for the week ending July 27, 2014.  Preparations for the structural steel and framing are underway.  The foundation has been waterproofed, and some fencing has been moved to preserve the nature outside the building site.  The dripline infiltration trenches  have been installed and are ready to be covered.  These shallow trenches absorb the meltwater coming off of the roof.  The concrete slab has been poured over the radiant heating tubes and is ready for framing.